FOR TERRACOTTA TILES FIXING IN BLOCK-A

BOQ - FOR  TERRACOTTA TILES FIXING IN BLOCK-A

Sl No.
Description Of Work

Length Width Qty Unit Unit Rate (Rs) Amount (Rs)
1 Cleaning the old cement mortar form wall as per requirement or as per instruction of office in charge and replaster in cement mortar 1:4 with cost of conveyance and taxes of all materials and labour with transportation and unused materials removed from campus.

20 20 400.0 Sqft.    
2 Providing adhesive (Tile Fixing adhesives Perma UTA Gold or Equivalent ) for terracotta tiles fixing including two tiles gape filling by cement sand mortar 4:1 with cost of conveyance and taxes of all materials and labour with transportation and unused materials removed from campus. (Terracotta tiles will be supplied by office)

50 30 1500.0 Sqft.    
3 Cement based weather proof painting two coats with approved colour with  one coat primer to wall surface, including cost of material, necessary scaffolding etc complete. 50 30 1500.0 Sqft.    
sistem algoritma mahjong wins 2 rumus probabilitas rtp mahjong ways 1 cara menghitung siklus scatter mahjong ways 2 repetisi simbol mahjong wins 3